Fangxian PPP Sewage Project
房县ppp污水项目设计,生活污水厂设计;最大水量为4000吨,最小水量为3000吨,采用是mbr技术,出水达到国家一级a排放标准。
The design of Fangxian PPP sewage project involves the design of a domestic sewage treatment plant with a maximum water volume of 4,000 tons and a minimum water volume of 3,000 tons. The MBR (Membrane Bioreactor) technology is adopted, and the effluent meets the national first-class A discharge standard.